top of page
Data MetalCraft Photos-293_edited.png

Data Metalcraft
Expansion

In 2022, Data Metalcraft relocated our HQ to an expansive campus in the rural community of Arlington, MN, to invest in the future of American Manufacturing. 

Next Generation factory

Data Metalcraft's new HQ is made up of 3 connected buildings, totaling over 180,000 sqft. The production floor is designed to allow product to move fluidly through each production step – from flat to forming to finishing. High speed internet throughout creates a connected factory with machines programmed and controlled digitally. LED lighting, environmental protections, and climate control creates a safe workspace or our team and protects your product. 

 

As a manufacturer, we need to scale as you do to keep up with your growth targets. On a campus size over 11 acres, Data Metalcraft’s new HQ is designed with the future in mind. The campus layout allows for over a doubling of production space while maintaining the efficient design and without disrupting existing production. 

Inspired by history

Our new HQ dates back to 1906. This facility served as a canning factory for 108 years, functioning as a backbone of the town. The building sat abandoned from 2014-2021 until Data Metalcraft worked with the local leaders to develop plans for renovation. Since breaking ground, Data Metalcraft has re-developed the existing structure into a next-generation factory, bringing jobs and opportunity to the local community. 

bottom of page